My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 1988 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 1:26:35 PM
Creation date
3/5/2019 1:32:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2000
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) follow all operating procedures specified by Franchisor; <br /> ( f) immediately report to Franchisor all suspected or confirmed releases from the tanks <br /> and connected piping system, unusual operating conditions, release detection signals and <br /> environmental conditions suggesting a release may have occurred, and any spills and overfills that <br /> are not contained and cleaned up; <br /> (g) properly close the underground tanks as required by law; and, <br /> (h ) comply with all federal, state and local legal requirements relevant to the operations <br /> of the underground tanks and all amendments to any permit to operate. <br /> 4. With respect to the operation of the underground storage tank system and monitoring <br /> equipment, Franchisee hereby acknowledges and agrees: <br /> - that ARCO has provided Franchisee with training on each of the items described in <br /> the attached Monitoring and Response Plan, <br /> - that Franchisee understood the content of the training, and asked any questions <br /> necessary to facilitate his understanding, <br /> - that Franchisee indicated to ARCO at the time of training any subjects addressed by <br /> the training which Franchisee did not fully understand, and <br /> - that Franchisee received complete training and information necessary for <br /> Franchisee to fully understand the subject of operating underground storage tanks. <br /> 5. Franchisor has provided Franchisee a copy of and Franchisee agrees to maintain on the <br /> Premises the Certificate of Financial Responsibility (as required by the United States <br /> Environmental Protection Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety <br /> Code, Chapter 6.7, Section 25292.2). <br /> 6. Except to the extent they conflict with, or are less rigorous than the terms of this <br /> Amendment, all of the terms and conditions of the PMPA Agreement, as previously or hereafter <br /> amended or supplemented, remain in full force. <br /> IN WITNESS WHEREOF, Franchisor and Franchisee have executed this Amendment. <br /> WITNESS: ARCO Products Company <br /> a division of At nvcRichfieldC mpany <br /> Franchisor <br /> y. <br /> WITNESS: <br /> FRANCHISEES NAME <br /> -- — — <br /> By: 9 <br /> DATE: <br /> 11 /91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.