My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 1988 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 1:26:35 PM
Creation date
3/5/2019 1:32:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2000
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Corr <br /> 17315 Studebaker Hoad <br /> Cerritos. California 90701-1488 ytt <br /> Telephone 213 404 5300 <br /> Mailing Address: Box 6411 <br /> Artesia, California 90702-6411 <br /> cz :46;, <br /> 1) <br /> November 6, 1991 (1)V 1 <br /> I L <br /> Administering Agency <br /> Re: Updated Monitoring and Response Plans <br /> Release Detection Methods <br /> Underground Petroleum and Used Oil Storage Tanks <br /> Dear Sir or Madam: <br /> ARCO has revised its monitoring and response plans to <br /> conform with the requirements of the August 1991 <br /> revisions to the California Underground Storage Tank <br /> Regulations. <br /> Attached are: <br /> a) A list of ARCO owned facilities located <br /> in your agency' s area of jurisdiction. <br /> b) A summary description of the various types <br /> of plans. <br /> c) A summary list of each facility indicating: <br /> 1. Type of Equipment <br /> 2 . Leak Detection Equipment <br /> 3 . Appropriate Monitoring Plan <br /> d) A copy of each detailed plan identified on the <br /> summary in (c) (3) above. <br /> Site specific construction has been identified for each <br /> facility in your agency' s area of jurisdiction and the <br /> monitoring and response plans were based on that <br /> construction. <br /> Please note that prior to 1/1/93 , all facilities <br /> currently using inventory reconciliation will be <br /> reviewed to determine distance to existing or highest <br /> anticipated ground water level and action will be taken <br /> to provide an appropriate method of leak detection. <br /> Revised monitoring and response plans will be submitted <br /> as necessary to meet these new findings. <br /> These monitoring and response plans are being submitted <br /> for approval per CCR, Title 23 , Article 4 , Section 2641 <br /> (g) and will assume to be approved if we have not heard <br /> to the contrary by November 30 . These plans will then <br /> be put into effect. <br /> ARCO Pmd,Cjs Company is D-115,01 0'Allan-R,ChfielclCompany <br />
The URL can be used to link to this page
Your browser does not support the video tag.