Laserfiche WebLink
' TECHNICAL SPECIFICAANS <br /> ' • Compatible with <br /> Y." <br /> k- <br /> ...100% gasoline, methanol, and ethanol <br /> ...Any combination of the above <br /> ...100% diesel <br /> T' ...Up to 15% MTBE <br /> ...Kerosene/jet A <br /> • Use with any line/pipe system up to 250 n <br /> g bleed back <br /> • an UL fistedpumps: <br /> For use with <br /> Y <br /> X h.p., 4 h.p., and 1� h.p — 20-50 psi, <br /> volume to 90 GPM <br /> • Certified to handle 10 feet of head pressure <br /> • Combination line check/pressure relief, <br /> prevents drainback into the tank <br /> • Hardened 17-4 stainless steel metering <br /> pin and poppet <br /> • Unique upper cylinder piston functions <br /> without a pressure relief <br /> • Can be installed in any position <br /> • Tamper-proof bolts accommodate wire seal <br /> to prevent tampering <br /> • For installation in any submersible pump <br /> with a 2 inch NPT port, or a 2 inch leak ,. <br /> t <br /> detector adapter tee <br /> • Leak detector is nickel-plated, schedule 40 <br /> cast iron construction <br /> • MIL Spec. #R-83248 Fluorocarbon O-ring - <br /> • UL listed and certified (3 GPH @ 10 psi) <br /> or fine systems up to 130 gallons <br /> • Compatible with thermal contraction <br /> accumulator for extreme == <br /> temperature differentials <br /> • Vent line must be unobstructed, leak-proof, and connected to a <br /> zero pressure port <br /> • For a complete list of materials and other specifications, please contact VMI. <br /> Warranty Information <br /> The '96 LD-2000 mechanism is fully guaranteed to see a leak of 3 GPH @ 10 psi <br /> for a period of 18 months after date of installation. Warranty card and <br /> installation instructions included in packaging. <br />