My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 1988 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 1:26:35 PM
Creation date
3/5/2019 1:32:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2000
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/22/99 17:51 N0.034 1?13 <br /> Piping system layout Trenching,bedding and backfilfing <br /> Althoa.igh li;aergiass pipe has excellent strength,it must be protected against impact <br /> which my occur from improper handling or during backfilling. <br /> • Provide a trench width equal to the pipe diameter pi us six inches on each side. <br /> Separate multiple lines by at least 4 inches.Peter to Fig.8-1. <br /> • Provide a minimum of 18 inches of select backfill between tate top of the pipe and <br /> unpaved ground surfaces. <br /> • Provide a minimum of 4 inches of select backfill between the top of the pipe and <br /> reinforced concrete pavement(4 Inches minimum thickness). <br /> • Provide a minimum of 8 inches of select backiiil between the top of thi pipe and <br /> asphalt pavement(2 inches minimum thickness). <br /> • Slope the trench bottom evenly from the dispensers backto sumps or tanks at a <br /> minimum'A Wft of slope. <br /> • The trench bottom must be free of hard or sharp ab)ects. <br /> • Grade the trench bottom with at least 6 inches of select backfill to provide firm, <br /> even support for the pipe.Compact the subgrade well to prevent differential <br /> settling. <br /> • Protect the pipe from impact during backfilling and abrasion during operation by <br /> surrounding it with four to six Inches of select backfill such as washed sand,pea <br /> gravel(fie-inch maximum)or cnrshed stone Ph-inch maximum). <br /> • Wrap pipe tying near concrete with rubber or foam padding to avoid direct <br /> contact with the concrete. <br /> I NaveAM <br /> --� <br /> avcr+xe <br /> 4(mint <br /> ` 1 a(min) <br /> (min) <br /> 4(mir, � CJ • � t <br /> Fig.6-1.Use onlysefectmamenafskv <br /> bedOV and baakfi fing Malay 30001L fuel I Med backfill a(miry <br /> handfingsysfams.Native materiels are rarefy <br /> suitaUs andshcu)d not be used. <br /> Matirb a(min) 6(rn(� <br /> sal <br /> i <br /> Frg.6-2.Dunrtgrayuut,bondingand <br /> lnspecdon,support tha piping on <br /> 2x4 blocks to keep rt�*jehrts craan j <br /> and to keep bedding <br /> cut ofrt7ep7pe, <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.