Laserfiche WebLink
From: Cesar- Environmental Health Ruvalcaba<cruvalcabaC&sicehd.com> <br /> Date: Monday, December 24, 2018 at 11:49 AM <br /> To:Jon Lorente<jonl0efuelco.com> <br /> Subject: RE:405 Vasconcellos Ave. Manteca, CA -SPCC Plan - PR0542543 <br /> Mr. Lorente. <br /> Attached is a list of violations that remain open for the facility located at 405 Vasconcellos Ave. <br /> Statements will be required as to how the violations have been corrected for the remaining open violations. <br /> Violation#203–A statement indicating that plan is being implemented as written or appropriate corrective action will <br /> be needed. <br /> Violation#618–If inspection records for tanks do not exist,a corrective action statement which indicates the <br /> inspections will be conducted and kept for three years will suffice. Submit current inspections for all tanks listed in the <br /> plan. <br /> Violation#714–Once a high level monitoring device is installed or its equivalent as allowed by regulations,a statement <br /> will need to be submitted indicating the corrective action.The SPCC plan indicates visual gauges but the SP-001 report <br /> indicates such devices are not present. <br /> FREE classes presented by NES Inc. are available to all San Joaquin County Hazardous Waste, Underground Storage Tank, <br /> and Aboveground Petroleum Storage Facility Business Owners and Operators. List and schedule of classes can be found <br /> here. <br /> Thankyou, <br /> Cesar Ruvalcaba <br /> San Joaquin County Environmental Health Department <br /> Environmental Health Specialist <br /> 1868 East Hazelton Ave <br /> Stockton,CA 95205 <br /> $ (209)953-62131 A (209)464-01381 ® cruvalcabaPsicehd.com <br /> SAN JOAQUIN <br /> —COV NIY— <br /> \�'� Gream«s grows here. <br /> From:Jon Joni oniC@efuelco.com> <br /> Sent:Tuesday, November 13,2018 1:58 PM <br /> To:Cesar Ruvalcaba [EH] <cruvalcabaC@sicehd.com> <br /> Subject: Re:405 Vasconcellos Ave. Manteca,CA-SPCC Plan <br /> Inspector Ruvalcaba, <br /> Thank you for your time and insight last week.As requested,attached is the return to compliance certification showing <br /> the SPCC plan and Integrity test were completed for 405 Vasconcellos.The remaining mechanical repairs are pending <br /> per our contractor and your review of the submitted documentation. <br /> Thank you, <br /> 3 <br />