My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSHIRE <br />ENVIRONMENTAL <br />SERVICES, INC. <br />25971 Towne Centre Drive <br />Lake Forest, CA 91610 <br />(949) 460-5200 <br />Fax (949) 460-5210 <br />April 30, 2004 <br />County of San Joaquin <br />Environmental Health Division <br />304 East Weber Avenue 3rd Floor <br />Stockton, CA 95202 <br />Attn: Donna Heran <br />Subject: Enhanced Leak Detection Work Plan <br />ARCO FAC# 05469 <br />130 S WILSON WAY <br />STOCKTON, CA 95205 <br />Dear Ms. Heran, <br />MAY 0 7 2004 <br />SAN JOAQUiN COUNTY <br />ENVIRONMENTAL HEALTH DEPT, <br />In accordance with Title 23, section 2644.1 of the California Code of Regulations and <br />Chapter 6.7, section 25292.5 of the California Health & Safety Code, enclosed is a work <br />plan for performing enhanced leak detection at the subject site for your approval. Also <br />enclosed is a site map showing the tank system layout. <br />Testing activities will not commence until the work plan is approved and required <br />notifications are made. Upon completion of testing activities, a copy of the test results <br />and a scaled site map indicating all sampling locations will be submitted to your agency. <br />Please do not hesitate to call me at (949) 460-5200 if you have any questions or require <br />additional information. <br />Sincerely, <br />Jim Brown <br />Sr. Project Manager <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.