Laserfiche WebLink
SWRCB, January 2002 Page of <br />1L.1 r i; #- ; t//, °i 9. SPILL/OVERFILL CONTAINMENT BOXES <br />,r - - , <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: Spill Bucket Manufacturer Indus tandard Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure VacuumHydrostatic <br />Other (Specify) <br />Test Equipment Used: t `; Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />'l <br />1 /r j? // <br />Bucket Depth: <br />7 <br />p <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />l© �l <br />l� A �' n+ <br />Test Start Time: <br />zIn <br />Initial Reading (Rj): <br />Test End Time: <br />cj'' 'fes <br />`) zm ?! eln <br />Final Reading (RF): <br />�q� %' / '• <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />f / <br />Test Result: <br />Pass a� <br />a Fail ass Fail <br />Pass Fail <br />Comments — (include information <br />V711I �1 Fri <br />to testing, and recommended follow-up for failed tests) <br />