My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRED FIEDLER AND ASSOCIATES <br />1390 Willow Pass Rd., Suite 605, Concord, California 94520-7906 <br />Telephone: 925/691-4444 Fax: 925/691-4441 E -Mail: FFA@FFA.com <br />DCA -(08814) <br />San Joaquin County <br />Environmental Health <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Attn: John Jackson <br />Subject: ARCO #5469, <br />130 S. Wilson Way <br />Stockton, CA <br />RE: Scope of work <br />Mr. Jackson, <br />October 16, 2003 <br />Per your request, here is the scope of work for the above mentioned project: <br />1. Contractor to saw cut 6' x 6' minimum sections of existing tank slab at each manhole as shown. <br />2. Contractor to remove existing fill spill buckets. Remove existing drop tube flapper valve (if any) <br />and any non-EVR ball floats. <br />3. Contractor to install new EVR riser adapters. <br />4. Contractor to install new 5 gallon spill containment buckets and manhole w/frame at each tank <br />fill. EVR VR- 102-B compliant. Install new water shield and riser supports at each fill sump. <br />5. Contractor to install new fill drop tube and ball floats at each tank. EVR VR- 102-B compliant. <br />6. Contractor to install new riser components at existing tank gauge risers. Field verify exact riser <br />location. EVR VR- 102-B compliant. <br />7. Contractor to install new pressure vacuum vent valve as needed, at each gasoline vent riser. EVR <br />VR -102-B compliant. <br />8. Contractor to patch all removed concrete to match existing. <br />9. Install new Veeder-Root overfill alarm w/acknowledgement switch and new automatic tank <br />gauging if not existing. <br />10. Contractor to install new 42" sumps and Veeder-Root sensors at each tanks fill/vapor risers. <br />Contractor to bond and seal sumps per manufacturers specifications and SB989 compliance. <br />Sensors to be located at lowest point in sump. <br />11. Contractor to remove existing monitoring system and sensors and install new Veeder-Root TLS - <br />350 monitoring system with new sensors at all dispensing sumps, turbine sumps, and interstitial <br />monitors. Program system for "Fail Safe" and positive shutoff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.