Laserfiche WebLink
Page k of 11 <br />10 UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test. Method Developed By:. LI iTDC Manufacturer X industry Standard ❑ Professional Engineer <br />D Other (Specify) <br />Test: Method Uses: 1_I Pressure n Vacuum X Hydrostatic <br />❑ Other (Sprvify) <br />Measuring Equipment Used for Testing Ancon TS -STS <br />UDC # UDC # UDC # <br />UDC Manufacturer: <br />UDC MatCrial: <br />UDC Depth: <br />Height from UDC Bottom to <br />Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of LTDC prior to <br />testing: <br />Portion of UDC Tested_ <br />Does turbine shut down when <br />UDC sensor detects either <br />product or water? <br />Turbine shutdown response <br />time. <br />Is system programmed for fail- <br />safe shutdown? <br />Was fail-safe verified to be <br />operational? <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />initial Reading (Rj): <br />Test End Time: <br />Final Reading (Rt): <br />Test Duration: <br />Change in Reading (RF -R4): <br />Pass/Fail Threshold: <br />Test Result: <br />Was sensor removed for <br />Icstin 7 <br />Was sensor properly replaced <br />after testin 7 <br />Comments — (Include information on repairs made to facilitate a passing test and indicate whether a <br />hermit was ohtained fur the repairs) <br />Note: Hydr(ockatic t&*ting of the UDC should, at a minimum, provide for a liquid level that tests to <br />the highest point of piping projection into the containment vessel. <br />R.C_U.S.T_COM December 2001 <br />