Laserfiche WebLink
Page 16 of It <br />12 FILL RISER CONTAINMENT SUMP TESTING <br />Test Method Developed By: D Sump ?Manufacturer X Industry Standard U Professional Engineer <br />(-) Other (,Sped) <br />Test Method Uses: D Pressure D Vacuum X Hydrostatic <br />EI Other (Specify) <br />Measuring Equipment Used for Testing: Incon TS -STS <br />Fill Sump # Fill Sump # Fill Sump # <br />Surnp Diameter. <br />Sump Depth: <br />Hcight from Tank Top to <br />Highest Piping Penetration-- <br />enetration:Height <br />Heightfrom Tank Top to <br />Lowest Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />-starting test: <br />'Gest Sratz Timc: <br />Initial Reading (Rt): <br />Test End Time: <br />Final Readin (Ri): <br />Test Duration: <br />Change hi Reading RF -14): <br />Pass/Fail 'Threshold: <br />Test Result: <br />is there a sensor in the sump? <br />Does the sensor alum when <br />either pmduct or water is <br />detected'? <br />Was sen:4or removed for <br />testing? <br />Was sensor properly replaced <br />after testing? <br />Comments — (include information on repairs made to,facilitate a passing rest and indicate whether a <br />permit wa., obtained for the airs) _ <br />R_C_U.&T_COM. December 2001 <br />