My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michelle Le [EH] <br />From: Frank Kramer [Kramer@sjweaver.com] <br />Sent: Wednesday, March 12, 2003 2:39 PM <br />To: Michelle Le [EH] <br />Cc: Jim Brown (E-mail); Mike Ellis (E-mail); Thomas Schmitz; Jim Shine (E-mail) <br />Subject: ARCO # 5469 130 S. Wilson Way, Stockton <br />Michelle, <br />This e-mail is confirm our telephone conversation on Monday the 10th of May. <br />It is my understanding that no permits will be required to make the SB 989 <br />repairs if no concrete is broken and all repairs are made inside the sumps <br />and UDC's. <br />Please confirm that this information is correct. <br />The scope of work is: <br />1. Repair sump penetrations in turbine sumps 87, 89,& 91 octane with <br />Blueline Technologies split repair boots. <br />2 Repair spill buckets on all three tanks 87, 89,& 91 octane. <br />3. Remove dispenser 11/12 and repair the UDC. <br />All repairs are to be done without breaking concrete and will be performed <br />inside the sumps and UDC. <br />Repairs will be performed on Tuesday 3/18 and Wednesday 3/19. <br />Testing is to be performed on Thursday 3/20/03 @ 8:00 AM <br />Thank You <br />Frank Kramer <br />Project Manager <br />S.J.Weaver Contracting Inc. <br />Phone (562) 290-8859 <br />Fax (562) 988-8165 <br />Cell (562) 881-7902 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.