Laserfiche WebLink
by BP West Coast Products LLC <br />4 Centerpointe, LPR 4-451 <br />La Palma, California 9062�ECRUED <br />R <br />Mailing Address: Box 603 <br />vhArtesia, CA 90702-6038 <br />Voice (714) 670-5336 JUN 0 3 2002 <br />Fax (714) 670-5420 <br />Email koskennm@bp.comENVIRON,MENT HEALTH <br />PERMIT/SERVICES <br />May 29, 2002 <br />San Joaquin County Environmental Health Department <br />Attention: Inspection Michelle Sterni -Le <br />304 East Weber Avenue, Third Floor <br />Stockton, CA 95202-2708 <br />Via USPS <br />RE: Hazardous Waste Inspection Report <br />ARCO Facility #5469 – 130 South Wilson Way, Stockton <br />Inspector Sterni -Le: <br />I received a copy of the Hazardous Waste Inspection Report that was given to the <br />abovementioned ARCO facility during a routine inspection. Below is a list of the violations <br />noted and their corrective actions. <br />Violation: Spill containers for all three products contained liquid. <br />Corrective Action: Liquid was removed from spill containment by Scott Company (see <br />attached work acknowledgement). Station operator has also been advised that all spill <br />containment must be kept clean and dry at all times. <br />Violation: Monitoring and response plan is incorrect. <br />Corrective Action: Report indicates that this item was resolved at the time of the <br />inspection. However, I have developed a new Monitoring and Response Plan which <br />reflects the equipment at the station to the best of my knowledge (see attached Plan). A <br />copy has also been forwarded to the site with instructions to make it available to <br />employees and Agency Inspectors at all times. <br />Violation: Daily monitoring log not being kept. <br />Corrective Action: A daily UST alarm log has been provided to the station operator, and <br />he has been instructed to forward a copy of that log for the month of April and May. <br />Violation: Station does not have automatic pump shut -down from the under dispenser <br />containment and must therefore have an annual line tightness test performed. <br />Corrective Action: A line tightness test was performed in October of 2001. Bill McCarthy <br />spoke with you and determined that a line test was not required at this time, but must be <br />done on or before October 2002. <br />Violation: 2-5 gallon buckets with unknown contents and 1-55 gallon drum with waste <br />cement on site—all containers must be properly labeled. Remove all hazardous waste <br />from site. <br />