My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Q/12/2000 15:27 7146705a20 <br />IN Produco Company <br />Station # <br />Address _ <br />HSE DEPT <br />PAGE 06 <br />Mechanical Leak Detector Test Data Sheet <br />Date � L t") 1� <br />- I Test Information <br />Replaced All Famed Leak Detect) rs Xes No . N/A _ .. <br />If No, Replacement To Be Corn eted By (Date) I I <br />This letter certifies that the a ual leak detector tests were performed at the above referenced facility <br />according to the equipment marufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. Tbe mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI, <br />Inspected By: Contractor <br />Technician Lic# <br />Signature <br />APC -=5 (01N) <br />1 <br />2 <br />3 <br />4 <br />5 <br />Product <br />Manufacturer <br />U1 <br />v }.��, <br />KJO LO <br />A qn <br />Model <br />Full Operating Pressure (psi) <br />' <br />i <br />Line Bleed Back (ml) <br />Trip Time (sec) <br />' <br />Metering Pressure (psi) <br />F/E Holding Pressure (psi) <br />V <br />Test Leak Rate (ml/min) (gph) <br />jqo�, M <br />PASS or FAIL <br />sg> <br />Replaced All Famed Leak Detect) rs Xes No . N/A _ .. <br />If No, Replacement To Be Corn eted By (Date) I I <br />This letter certifies that the a ual leak detector tests were performed at the above referenced facility <br />according to the equipment marufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. Tbe mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI, <br />Inspected By: Contractor <br />Technician Lic# <br />Signature <br />APC -=5 (01N) <br />
The URL can be used to link to this page
Your browser does not support the video tag.