My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dosifior-Sensitive Sensor instaiiation Manua' Sensor Serua Nore= <br /> —� �- From probe,.. <br /> JL <br /> sensor,.or <br /> � 7. `� �-•.;�;^ � transducer To console <br /> Make sure.that <br /> `the ends of cable.� <br /> i sheathing are sub- <br /> ,,. <br /> ' merged to sealant F Tie wrap <br /> ✓ t <br /> _--Wire nuts <br /> Instructions: <br /> NOTE: When temperature is below:WF .(10'C), 4.iMix thoroughly,to:a uniform color by squeezing <br /> keep resin in.a warm;place,.priorto mixing (e.g., :contents back.and forth 25-30 times. <br /> in an inside pocket next:to.body). B.-Squeeze mixed,warm resin into one end of bag <br /> 1. :Open epoxy sealant package, andremoveresin and cutoff other end <br /> pak.` - 6. Slowly insert:wiring-connections into sealing <br /> 2. Holding resin as-shownin A, bend pak along pack until they fit snuglyagainst the opposite <br /> long.length. - - end asshown in C. <br /> 3.As.shown in B,firmly squeeze the RED 51Dc of 7.Twist open:end of be and use:tie wrap to close <br /> the::resin, forcing it.through the rcenter,seal Pand .it off and position-the tie wrapped Lend.up until <br /> ,ntD.B.LACK'SIDE. the resin jells. <br /> probes\eoxy2w.eps <br /> „... Figure S. Epoxy Sealing Two-Wire Connections <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.