Laserfiche WebLink
3 Pinina Leak Detection Monitorina E ui ment <br />M onitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />® Sump leak sensors connected to <br />Veeder Root <br />794380-208 <br />Continuous <br />continuous monitoring system <br />794380-344 <br />Specify type: <br />Veeder Root <br />794380-208 <br />Continuous <br />❑ Discriminating <br />Continuous <br />❑ Non -discriminating <br />® Mechanical line leak detectors with <br />Vaporless <br />LD -2000(91) <br />programmed leak threshold of three <br />Red Jacket <br />FX1 D(89) <br />Every pumping cycle <br />gallons per hour <br />® Electronic line leak detectors with <br />Veeder Root <br />PLLD (87) <br />programmed leak threshold of : <br />Every pumping cycle <br />❑ 0.1 gph 00.2 gph ®3 gph <br />® Line integrity testing by: <br />❑ Electronic line leak detector is <br />equipped to conduct line tightness <br />® Annually <br />testing <br />❑ Other: <br />® Third party testing <br />❑ Not required <br />❑ Other (Specify): <br />4. Dispenser Leak Detection Monitoring Equipment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />❑ Mechanical float in dispenser <br />Continuous <br />containment <br />® Electronic leak sensor in dispenser <br />Veeder Root <br />794380-208 <br />containment: <br />❑ Discriminating <br />Continuous <br />® Non -discriminating <br />❑ Visual inspection <br />❑ Daily <br />❑ Other: <br />❑ No under -dispenser containment <br />❑ Other (specify): <br />5. Positive bhutdown Gapabilities <br />❑ System does not have positive shutdown capabilities <br />r❑ Individual dispenser shutdown will occur whenever release is sensed in under -dispenser containment <br />® Automatic pump shut off will occur whenever: <br />® Release is sensed in turbine sump <br />® Release is sensed in primary piping <br />® Release is sensed at dispenser <br />® Monitoring system is disconnected or fails in any way (fail safe) <br />❑ Other (specify): <br />6. Secondary Containment Testin <br />❑ Secondary containment is not tested <br />® In the State of California, secondary containment systems installed on or after January 1, 2001, shall be tested upon installation, <br />six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br />shall be tested by January 1, 2003, and every 36 months thereafter. <br />7. Annual Equipment Certification/Testing <br />® Annually <br />❑ Other (specify): <br />2 <br />