My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVITATION FOR BID <br /> BID FORM <br /> Nomellini Construction Co. <br /> 1045 West Charter Way , Stockton , California <br /> TASK 1 - PLANNING AND PERMITTING <br /> 1 . Review of existing reports/information : _ hrs . @ /hr. $ <br /> 2 . Work plan preparation / SHSP preparation : Lump sum : $ <br /> 3 . Drilling permit: $ <br /> 4 . Regulatory liaison : _ hrs . @ /hr. $ <br /> TOTAL - TASK 1 : S <br /> TASK 2 - DRILLING , SAMPLING AND INSTALLATION OF WELLS <br /> 1 . Installation and sampling of SVE wells : 5 wells @ <br /> 2 . Installation of IAS wells : 7 wells @ /well S <br /> 3 . Laboratory analysis - TPH-g/d/BTE&X : 20 @ /each $ <br /> 4 . Laboratory analysis - VOCs 8260 : 13 @ 'each S <br /> 5 . Soil aeration (a) Permitting and sampling : Lump sum : $ <br /> (b) Sampling - TPH-g/BTE&X 2 @ 'each $ <br /> TOTAL - TASK 2 : S <br /> TASK 3 - SYSTEM INSTALLATION <br /> I . Installation of SVE/IAS network : Lump sum : S <br /> 2 . Fenced enclosure : Lump sum : S <br /> 3 . Installation of natural gas line (300 fee) : Lump sum : $ <br /> 4 . Installation of electrical connection : Lump sum : S <br /> 5 . Installation of SVE/IAS systems (move-in, etc . ) : Lump sum : $ <br /> TOTAL - TASK 3 : $ <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.