Laserfiche WebLink
i <br /> i <br /> 1 21 February 1996 <br /> AGE-NC Project No . 95-0121 <br /> Page 2 of 2 <br /> levels. Installation of the proposed SVE/IAS system will be the most cost-effective approach to <br /> attain cleanup goals. <br /> Bioremediation is still recommended as the contingency remedial method for the site. However, as <br /> requested by the PHS-EHD, site-specific microbiological data will be collected and evaluated prior <br /> to the initiation of any bioremediation system. <br /> Design specifications of the remediation system will be submitted to the PHS -EHD in a Remedial <br /> Action Work Plan. If you have any questions or require further information, please contact our office <br /> at (209) 956-0264 . <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> I <br /> Timothy J. CuAlar 4obMarty <br /> StaffGeologist Geologist/Director o perations <br /> I <br /> Enclosures <br /> cc: Mr. Dante John Nomellini <br />