My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0�1 <br /> AN 'I P: 5l A vT: N V I R0N M1` N 'tAL CO N S11LTA NTSa <br /> August 28, 1993 <br /> Mr. Dante Nomtrut <br /> Nomellini construction Co. <br /> P.O. Sox 1528 <br /> Stockton, CA 95201 <br /> Re: PHASE III . CORRECTIVE ACTION PLAN IMPLEMENTATION <br /> 1045 Charter Way <br /> Stockton, California <br /> Dear Mr. Nomellini: <br /> Artesian Environmental Consultants (Artesian) is pleased to present this proposal for <br /> the Phase III Corrective Action Plan Implementation, According to the SB-2004 fund <br /> information, the Phase Ill Corrective Action Plan Implementation includes <br /> implementation of the Corrective Action Plan; carrying out the selected method for <br /> remedying or mitigating effects of the unauthorized release; and monitoring, evaluating <br /> and reporting on the results. <br /> The costs are included on the REQUEST FOR PROPOSALS - PHASE III bid sheet. <br /> j Artesian is prepared to use a groundwater pump and treat system for the groundwater <br /> restoration and soil venting with in-situ bio-enhancement for the vapor-phase <br /> hydrocarbons in the soils above the groundwater. The vapors and contaminated <br /> groundwater will be treated above ground with either a catalytic oxidizer or an internal <br /> combustion engine (both options are listed). Carbon polishing is included for the <br /> vapors and Artesian assumes treated water to be discharged into the sanitary sewer. <br /> Numerous vapor and groundwater laboratory analyses will be required during the <br /> operations of the treatment system. <br /> Artesian has developed these numbers for planning and funding purposes. Actual <br /> i costs may vary. <br /> OVER THE LIFE OF THE PROJECT <br /> i <br /> f Task 1- Soil and Groundwater Treatment Plan INCLUDED IN PHASE H <br /> Task 2- Installation of Groundwater and Soil Treatment Systems <br /> $ 174,823 <br /> Capital Costs $297 ,000 <br /> 3 year O&M Costs <br /> TOTAL Phase III Corrective Action Plan Implementation $472, 803 * <br /> *NOT TO EXCEED PRICE - BASED ON PRESENT INFORMATION <br /> j 3175 Kerner Blvd., Suite E - San Rafael, CA 44901 TEL 415 .2574801 FAX 415. 257805 <br /> f <br /> OT ad 9S62S9h60 T 01 �H1N3WNM?� IoN3 NHIS31aH WMd 02 : 2T £66T -T2-9fTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.