My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> State Water Resources Control Board <br /> Peter M. Rooney John P. Caffrey, Chairman <br /> Secrr - <br /> Pete Wilson <br /> Environmental Division of ePnWater Programs Governor <br /> Protection <br /> 2014 T Street, Suite 130 • Sacramento, �Califomia 95814 9 (916) 227-6010 FAX (916) 227-4530 <br /> Mailing Address: P.O. Boz 944212 • Sacramento, California • 94244-2120 <br /> Internet Address: http://www.sw eb.ca.gov/-cwphome/ustet%fundhome.htm <br /> September 4, 1998 <br /> Nomellini Construction Company <br /> P O Box 1528 <br /> Stockton, CA 95201 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 552, <br /> SITE ADDRESS : 939 & 1045 CHARTER WAY W, STOCKTON, CA 95206 <br /> I have reviewed your request, received on 10 June 1998 for pre-approval of corrective action costs. The total <br /> cost pre-approved for completing the implementation of the CAP as approved by the San Joaquin County EHD <br /> (County) in their 17 July 1997 letter is $131 ,697 (per Advanced GeoEnvironmental lowest bid). The pre- <br /> approved amount includes costs for the installation of SVEAAS wells, SVE/IAS system, monthly O & M, bi- <br /> annual soil sampling, quarterly groundwater monitoring and reporting, all for a duration of 24 months. Upon <br /> completion of each phase of work including periodic system effectiveness evaluations, you are required to <br /> submit the results/findings to the County and the Fund for reviews. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and necessary <br /> corrective action costs for work directed and approved by the County will be eligible for reimbursementper the <br /> terms of your Letter of Commitment at costs consistent with those pre-approved in this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. Future costs for corrective <br /> action must meet the requirements of Article ]], Chapter 16, Underground Storage Tank Regulations. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental proposal in my pre-approval above, please be <br /> aware that you will be entering into a private contract: the State of California cannot compel you to sign any <br /> specific contract. This letter pre-approves the costs as presented in the bid proposal by Advanced <br /> GeoEnvironmental for conducting the work approved by the County. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before you <br /> will be reimbursed. To make this easier, insure that your consultant prepares his invoices to match the format <br /> of the original estimate, and provides reasonable explanations far any changes made in the scope of work. <br /> When the invoices are submitted you must Include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> I can be reached at (916) 227-6010 should you have any questions. <br /> California Environmental Protection Agency <br /> rid Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.