My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:38:20 PM
Creation date
3/6/2019 1:37:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N Nomellini Property December 2013 <br /> 1045 West Charter Way, Stockton <br /> Claim No: 552 <br /> Monitoring Well Information <br /> Well Designation Date Installed Screen Interval Depth to Water <br /> (feet bgs) (feet bgs) <br /> (03/06/13) <br /> MWA February 1991 33 - 53 NM <br /> MW-2 February 1991 32 - 52 NM <br /> MW-3 February 1991 30 - 50 NM <br /> MW-4 Aril 1992 30 - 45 14. 08 <br /> MW-5 Aril 1992 30 - 45 14 . 59 <br /> MW-6 May 1992 25 - 40 13. 85 <br /> MW-7 December 1994 25 - 45 NM <br /> MW-8 December 1994 24 - 44 NM <br /> MW-9 December 1994 22 - 42 NM <br /> MW- 10 June 2006 55 - 60 14 . 15 <br /> MW- 11 June 2006 40 - 50 15. 02 <br /> MWA2 June 2006 55 - 60 14. 03 <br /> MW- 13 November 2007 104 - 114 14 .35 <br /> MW- 14 November 2007 95 - 105 13 . 85 <br /> MW-15 November 2007 105 - 115 14. 09 <br /> EW-1 July 1995 20 - 40 NM <br /> vW- 1 July 1995 15 - 30 NM <br /> VW-2 July 1995 15 - 30 NM <br /> VW-3 October 1998 5 - 20 NM <br /> VW-4 October 1998 5 - 20 NM <br /> VW-5 October 1998 5 - 20 NM <br /> VW-6 October 1998 5 - 20 NM <br /> VW-6 October 1998 5 - 20 NM <br /> VW7 October 1998 5 - 20 NM <br /> VW-8 October 1998 5 - 20 NM <br /> VW-9 October 1998 5 - 20 NM <br /> AW- 1 November 1998 25 - 30 NM <br /> AW-2 November 1998 25 - 30 NM <br /> AW-3 November 1998 25 - 30 NM <br /> AW-4 November 1998 25 - 30 NM <br /> AW-5 November 1998 25 - 30 NM <br /> NM: Not measured <br /> Remediation Summary <br /> • Free Product: Not noted since 2004. <br /> • Soil Excavation: An unknown volume of impacted soil was excavated to a depth 19 feet in <br /> November 1988. Disposition of those soils is unknown . <br /> • In-Situ Soil/Groundwater Remediation : Soil vapor extraction and air sparging were conducted <br /> between 2000 and 2005 , which reportedly removed 450 pounds of TPHg . Dual phase <br /> extraction started in October 2009 and presently ongoing , removed 4, 528 pounds of TPHg and <br /> 4 million gallons of contaminated groundwater. The rate of extraction in June 2013 was <br /> approximately 3 pounds of TPHg per day. <br /> Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.