My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:38:20 PM
Creation date
3/6/2019 1:37:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dante John Nomellini -2- 9/14/09 <br /> 552 <br /> COST PRE-APPROVAL BREAKDOWN <br /> Classification UNITS OUANITITY UNIT COST COST <br /> PERMITTING/PRE-FIELD <br />{JI ACTIVITIES <br /> Planning & Coordination Project hrs 20 $120.00 <br /> Manager $12400.00 <br /> Air Permit ea 1 $3500.00 $3,500.00 <br /> Discharge Permits ea 1 $1500.00 $1500.00 <br /> Electrical power hook up with unit 1 $6000.00 <br /> meter $6,000.00 <br /> Utility Clearance hrs 1 $150.00 $1 ,502.00 <br /> TRENCHING/PIPING AND - <br /> ENCLOSURE INSTALLATION <br /> Treching/Piping Installation Well unit 1 $6,000.00 $6,000.00 <br /> Box Installaion <br /> Piping and Supplies unit 1 $600.00 $600.00 <br /> Re-surfacing unit 1 $1 ,000.00 $1 ,000.00 <br /> Fenced Enclosure Installation unit 1 - - $2,500.00 $2,500.00 <br /> Concrete Pad and Secondary unit 1 $3,000.00 $3,000.00 <br /> Containment Installation <br /> Debris Disposal unit 1 $650.00 $650.00 <br /> 3-24" Traffic rated Remediation unit 1 $1 ,000.00 $1 ,000.00 <br /> Well Boxes <br /> SYSTEM INSTALLATION <br /> Dual Phase Extraction System <br /> Air Stripper Pre Treatment as _ 1 $522839.00 <br /> $52,839.00 <br /> System <br /> Carbon Vessels ea 1 $307247.50 $30,247.50 <br /> Chemical Pre-Treatment System as 1 $15,968.50 $15,968.50 <br /> Pre-Treatment Sampling Event as 1 $5,000.00 $5,000.00 <br /> for Water Chemistry Evaluation <br /> Field Vehicle da 1 - $60.00 $60.00 <br /> Piping/Miscellaneous Supplies unit 1 $1 ,000.00 $1 ,000.00 <br /> SYSTEM STARTUP AND <br /> CONFIGURATION (One week - <br /> period) <br /> Project Scientist hrs 4 $90.00 $360.00 <br /> Technician hrs 30 $70.00 <br /> $2, 100.00 <br /> SupportVehicle day 5 $60.00 $300.00 <br /> PID day 5 $ 100.00 $500.00 <br /> Misc upplies day 5 $25.00 $125.00 <br /> Tedlar Bas ea 10 $15.00 $150.00 <br /> Laboratory Analysis ea 50 - $135.00 $6,750.00 <br /> Laboratory Shipping as 3 $20.00 $100.00 <br /> $144,540.00 <br /> California Environmental Protection Agenc7r <br /> �.a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.