Laserfiche WebLink
.. - In. <br /> .:F <br /> 'FABLE 2 <br /> MONITORING WELL CONSTRUCTION DETAIL a <br /> NOMELLINI CONSTRUCTION <br /> SrrE TOC TOP BOP Total Coordinate Location Casing Packing Screen ` <br /> NUMBER. (MS:;' (MSL) (MSL) Depth X X Diameter Material Tyree <br /> t <br /> U <br /> B-10/MW-01 7.07 -2x.93 -45.93 53.00 1141.000 101I.200 2.00 2112 Sand 4.02 inch <br /> B-11/1%1%V 02 7.02 -24.98 -44.98 52.00 I103.690 1074.750 2.00 2112 Sand 0.02 inch <br /> B-12/MW-03 7.03 -22.97 -42.97 51.50 1046.380 1013.870 2.00 2112 Sand 0.02 inch <br /> f t-- <br /> ----- ------------------_....-. -----------------—-----—------------------------------ -------------------------.—----------------------------------- <br /> Notes: <br /> GSE-C,round Surface Elevation <br /> TOC-Top of Casing <br /> TOP-Top of Perforation <br /> BOP-Bottom of Perforation <br /> -Total Depth measured from the top of well casing (in feet). <br /> -Coordinate location referenced to a local benchmark(in feet). <br /> Casing diameter is Iisted as outside pipe diameter(in inches). <br /> -Screen type lisied for machine slotted pipe(in inches). <br /> ' V(IID111FFB91PfEL <br /> ',ll <br /> t �I <br /> C <br />