My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> E <br /> f"` 1 Artesian Environmental Consultants, Inc. <br /> Standard Operating Procedures <br /> GROUNDWATER LEVEL MEASURING, PURGING AND SAMPLING <br /> Prior to groundwater sampling,static water level measurements are recorded for <br /> each well using a battery-powered s, der with a precision of plus or minus 0.01 <br /> feet- All measurements are rxorded a:' depth-to-water from the surveyed <br /> measuring point at the top-of-casing. Depth-to-water readings are convened to <br /> water level elevations referenced to the USGS mean sea level datum. <br /> Then each well is purged by evacuating a minimum of three to five well-casing <br /> volumes of groundwater using either a dedicated polyvinyl chloride(PVC)bailer, <br /> sterile disposable bailer or a stainless steel pump. During the purging of each well <br /> and prior to sampling,discharge water temperature,specific conductivity,and pH <br /> measurements are recorded and are allowed to stabilize. Stabilized measurements <br /> indicate that formation water has entered the well. The groundwater sample is <br /> taken when the water level in the well recovers to 80%of's static level. <br /> Following purging,a groundwater sample is collected in accordance with <br /> California Regional Water Quality Control Board(RWQCB)procedures described <br /> in the Leaking Underground Fuel Tank (LUFT)Field Manual,the Tri-Re;ional <br /> Board Staff Recommendations for Preliminary Evaluation and lnvesrigarion of <br /> Underground Tank Sites,and local regulatory guidelines. <br /> A groundwater sample is first collected and check ed for the presence of free <br /> product in the sampling bailer. Thickness of possible free product is measured <br />` using an electronic interface probe with a plus or minus 0.01 foot detection limit. <br /> Groundwater samples are collected using a pre-cleaned teflon or stainless steel <br /> bailer equipped with a ball-check valve,and sample containers are filled.;irectly <br /> from the bailer as soon after purging as possible. <br /> Agitation is minimized during sample retrieval,and sample inunsfer tJ laboratory <br /> prepared sample containers in order to minimize sample aeration. Groundwater <br /> samples to be analyzed are carefully decanted into laboratory-prepared.40- <br /> milliliter volatile organic analysis(VOA)vials. The VOA vials are filled <br /> completely, leaving no headspace,and are capped and sealed with Teflon-lined <br /> lids. Additional groundwater samples may be collected in l liter bottles. Ali <br /> samples are labeled and stored in an ice chest with crushed ice to maintain a <br /> constant temperature of 4 degrees Celsius. A thermometer is kept in the ice chest <br /> to ensure that the proper temperature is maintained. The samples we then <br /> delivered under chain-of-custody to a state-certified hazardous ntawiials testing <br /> laboratory. <br /> Mora )r well purge water is properly stored onsite pending off-site disposal. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.