My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
193 �ffllqi 12'' 0111-1 0Z <br /> Tw 14 <br /> s' . <br /> Er <br /> J IN7R017UCTIOI`7 , <br /> A_ SITE LOCATION: 1045 West Charter Way, Stockton, CA <br /> Olivia Jacobs 3/31/92 <br /> B. PLAN PREPARED: - <br /> Name rr Dale <br /> C. PLAN APPROVED. James Jacobs_ <br /> Project Manager Date <br /> Health and Safety Group Date <br /> D. PLAN REVISED: <br /> Name Date <br /> r� <br /> `. E. REVISION APPROVED: <br /> Projed Manager Date <br /> ✓7 Health and Safety Group Date <br /> F. THE POSSIBLE HAZARDS ON THIS JOB ARE EXPECTED TO BE:_ilndr rg rn;:nd andbove- <br /> ground utilities, mechanical hazards from drillirLghazards <br /> from gasoline and diesel in soil and grounuwocer, vehicular traffic, <br /> rig noise, compressor noise, lifting heavy materials and equipment, <br /> G. REQUIRED PERSONAL PROTECTIVE ITEMS AND EQUIPMENT FOR THIS PROJECT: slipping, <br /> Level D: Hard hat, safety <br /> tripping <br /> and fallinc <br /> safety vests. Possible upgrade to Level C: Above equipment <br /> plus tyvek coveralls, and air purifying respirator with organic <br /> vapor cartridges. Upgrade from Level D if more than 100 ppm <br /> hydrocarbons detected with PID in breathing zone for one minute. <br /> Hydrocarbons are expected to exceed 100 ppm unless proven <br /> otherwise on this job. <br /> `l <br />
The URL can be used to link to this page
Your browser does not support the video tag.