My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 21 <br /> KLE114FELDER <br /> feet northwest of the excavation. The remaining samples had relatively low concentrations <br /> detected,but TPH were consistently detected just above the ground water surface. Ground <br /> water, encountered at a depth of 25 feet, was suspected of being affected by tt;y vertical <br /> migration of petroleum hydrecarbons. It appemed that petroleum hydrocarbons migrated <br /> vertically from the former USTs to the ground water surface and then moved laterally <br /> along, and in the capillary zone just above the wafer surface. Results of the soil boring <br /> investigation were presented in a Kleinfelder report dated Jura 14, 1989. : <br /> r} In October 1990,Nomellini Construction authorized Kleinfelder to conduct an assessment <br /> of ground water beneath the site. This report presents the field activities and analytical <br /> data associated with the ground water assessment. Conclusions and recommendations are <br /> also presented, and are subject to she limitations in Section.6 of this report. <br /> -mit and a wort: plan dated October 10, 1990, which <br /> K.leinfelder prepared a drilling peg <br /> outlined the proposed ground water assessment, prior to initiating it work. The work <br /> plan and drilling permit was approved by SJCEHD in December 1990. <br /> t <br /> F!8-91-62 3 <br /> Ycopyright, 1991 Fieln.fclder, Inc. <br /> �1 �d� <br />
The URL can be used to link to this page
Your browser does not support the video tag.