My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y , <br /> �W"Z <br /> KLEI`FELDER <br /> Al?I'E -DIS B <br /> YLE.IN,,FEILT)ER FIELD PRC?CEDUR3.S Jr <br /> DRILLING AND SOIL BORING SAMPLING <br /> augers was used to drill <br /> A CME-55 ;ruck-mounters drill rig :quipped with 8-incl) hollow stem <br /> � eulogist classified the soil, ' <br /> an <br /> experienced envtronnlenta. g i <br /> the borings. nuring drilling', qualitative field screening and potential <br /> wed the boreholes, and collected sample.. for <br /> log, <br /> laboratory U..alYs's. <br /> were collected approximately every 5 feet by <br /> advancing the boring to a point <br /> samplesa Modified <br /> California Sampler lined <br /> immed'sztely above the sampling depth and then driving' a 1 <br /> ler was then removed from the <br /> with three brass tubes into the.undisturhrd soil. The imp with Teflon sheets and tight j <br /> bottom of the boring, and the bottor' (third) tube was sealed ted cooler . At the end of <br /> fitting plastic cap <br /> s The sealed tube was immediately.stored in an : tical <br /> ins the samples were delivered under Chain-Of-Cus ode to the <br /> Lunde Chain- <br /> "' drilling operateis. i <br /> laboratory celtifl-A for the T2fTJ ted an�esfor future reference ornanalysis. j <br /> �. <br /> Of-Custody control in refrigerated storab <br /> � To retion, <br /> augers and associated <br /> duce the potential for cross-contaminaequipr!lent were steam <br /> Sampling a ui menL as cleaned with a trisodium i <br /> ". c,,eaned prior to drilling each borehole. The camp g q p WAS <br /> soil sampl:-_ Drill <br /> : <br /> phosphate wash and rsnsed with distilled water prior to collecting labeled and left onsite. <br /> cuttings removed from the borings <br /> p anon drums, <br /> were contai.i,d in 55-g ; <br /> MONITORING WELL CONSTR17CTiON <br /> MON <br /> i <br /> wells MW-1 through MW-3 were constructed in soil h^nngs B-10 through B-12, <br /> w• Monitoring we <br /> The wells were constructed as follows: ` <br /> 'spectively. j <br /> o . <br /> The wells were carstructed through 8-inch hollow stem augers <br /> t <br /> casing was 2-inch inside diameter, flush-threaded joint, schedule Q0, <br /> o The well g was steam-cleaned prior to installation. <br /> ASTM F-480 PVC pipe. The PVC p'pe <br /> 4 L <br /> FIS-91-52 <br /> j copyright 1991 Ktcinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.