Laserfiche WebLink
XLEINFELDER <br /> s <br /> 4. Three to five well volumes of water were purged from each well using a Teflon <br /> hand bailer. <br /> 5, physical parameters (pH, electrical conductivity and temperature) were <br /> monitored for stability during purging. <br /> 6. Sample were collected with a disposable acrylic bailer and poured into Glean <br /> bottles provided by California Anal tical Laboratory. <br /> g, Samples were immediately labeled and placed in an iced sample container. At <br /> were delivered to California Analytical <br /> the end of the day, the samples s <br /> L.aboratorylEnseco in West Sacramento under Chain-of-Custody control. The <br /> Chain-of-Custody is included in Appendix B. <br /> The well development and purge water was contained in 55 gallon drums, labeled, and left <br /> A <br /> r. onsite. <br /> a <br /> Y <br /> �I <br /> r i <br /> Fib-93.62 � <br /> Gor;7lyh! 1991 Kleinfeldar, Inc. <br />