My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z7r <br /> HAN <br /> } <br /> 4 �- �•� �'. - "wT �k Y fN� k y, '7i� � iii, <br /> 5 <br /> eL^i` <br /> h3IN KLEINFELDER <br /> 1 EXECUTIVE SUMMARY <br /> This is a work plan to perform a second phase ground water assessment investigation at the <br /> Nomellini Construction facility, Stockton, California. The San Joaquin Local Health <br /> .. District (SJLHD) has requested assessment of the vertical and horizontal extent of <br /> ' contamination based on the analytical results of soil samples collected from an open tank- <br /> excavation <br /> ankexcavation at the site. <br /> The collection of samples From radial borings is proposed to assess the presence of <br /> petroleum hydrocarbons contamination in the unsaturated soil, and the installation of <br /> monitoring wells is proposed to provide an initial assessment of tb�e ground water. The <br /> SJLHD requires submittal of a work plan prior to issuing a boring permit for drilling or <br /> monitoring well installation. <br /> A copy of this work plan should be sent to the SJLHD and the Regional Water Quality <br /> Control Board for their review and consideration. Once the SJLHD has issued the boring <br /> permit,Kleinfelder will implement the scope of work presented in this plan. <br /> -� 148-88-2109 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.