My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N• <br /> a <br /> KLEINFELDER <br /> All three monitoring wells will be developed after installation. Each well will first sampled <br /> with a clear acrylic bailer to visually inspect the sample for a product layer or sheen. If no <br /> product layer or sheen is observed on the water samples, the wells will Le developed with a <br /> surge-block, air-lift tool,and/or bailer. Surging along the screened interval of the well will <br /> draw the sediment from the formation into and out of the well and set the sand pack. The <br /> sediment-Iaden water will be air-lifted from the well at a rate of approximately 0.50 gallons <br /> per minute (gpm). Each well will be developed until the discharge water runs relatively <br /> clear of fines. Approximately 5 to 10 well volumes will be removed from each monitoring <br /> wed. <br /> After the wells have been developed,the aquifer will be allowed to equilibrate. The wells <br /> will then be purged and sampled. During purging, field parameters (pH, conductivity, <br /> temperature)will be monitored. Samples will be collected after the field parameters have: <br /> stabilized (normally requiring the removal of 3 to 5 weIl volumes). After collecting a <br /> sample, the sample bottles will be immediately sealed, labeled, and placed in an iced <br /> cooler. At the end of the field day, the water samples will be delivered under chain-of- <br /> custody <br /> hain-ofcustody to California Analytical Laboratories/Enseco in West Sara jento. <br /> To minimize cross-contamination, developing and sampling equipment will be <<eam <br /> _- cleaned prior to use in each monitoring well. Water generated during well deve',tping and <br /> purging will be contained in 55-gallon drums and stored on site pending results of water <br /> analyses. <br /> 3.5 MONITORING WELL ELEVATION SURVEY <br /> A ground water flow direction will be estimated from the three monitoring wells. The <br /> relative elevations of the top of the 2-inch PVC casings will be surveyed for the three wells. <br /> The casing elevations will be tied into an assumed elevation, or a nearby county or USGS <br /> benchmark. Depth to the static ground water table will be measured for the top of each <br /> PVC using. The depth to water will then be subtracted from the elevation of the top of <br /> -. the well casing to provide a water table elevation for each monitoring well location. The <br /> ground water flaw direction,will be estimated from the measured water table elevations. <br /> 148-88-2109 6 <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.