Laserfiche WebLink
KLEINFELnER <br /> r <br /> 3 SCOPE OF WORK <br /> This work plan presents a scope of work to collect soil samples from nine radial borings, <br /> and install and sample three onsite ground water monitoring weVs. Soil and water samples <br /> from the borings and wells will be analyzed to assess petroleum hydrocarbon <br /> contamination. <br /> 3.1 DRILLING OF SOIL BORINGS AND SAMPLING j <br /> A series of soil borings will be drilled along lines radiating away from the fuel tank(s) <br /> excavation in an attempt to assess the vertical and horizontal extent of soil contamination. <br /> The initial soil boring for each radial line will be placed at approximately 10 to.20 rCet <br /> away from the excavation. Soil samples will be collected at 5 foot intervals starting at a <br /> depth of 5 feet below the ground surface down to just above the ground water surface <br /> (approximately 20 to 25 feet below the ground surface). If the presence of petroleum <br /> hydrocarbons is indicated in the initial soil boring, the next soil boring will be drilled 10 tc <br /> 20 feet further away from the excavation along each radial line. The soil borings will be <br /> drilled at 10 to 20 foot intervals along each radial until a soil boring is drilled in which <br /> petroleum hydrocarbons do not appear to be present. The proposed locations of the radial <br /> borings are shown on the Boring Location Map(Plate 2). <br /> The borings will be advanced with a truck-mounted drill rig equipped with 5- or 8-inch <br /> hollow stem augers. During the drilling, an experienced environmental geologist will <br /> classify the soil,collect samples, and log the boreholes. Soil samples will be collected at 5- <br /> foot intervals to the bottom of each boring. Drill cuttings will be placed with the soil <br /> removed from the tank excavation or contained in plastic. <br /> Soil samples will be collected by advancing tâ–ºle boring to a point immediately above the <br /> sampling; depth and then driving a Modified California Sampler lined with three brass <br /> tubed into the undisturbed soil. The sampler will then be removed from the bottom of the <br /> boring and the bottom (third) tube sealed with teflon and tight fitting plastic caps. ""he <br /> sealed tube will be immediately stored in an iced cooler. At the end of drilling operations, <br /> select soil samples will be delivered, under chain-of-custody to a state/EPA certified <br /> i <br /> 148-88-2109 3 <br />