Laserfiche WebLink
I 1 <br /> 1 <br /> 28 January 2006 <br /> AGE-NC Project No 95-0121 <br />' Page 9 of 9 <br /> 23 December 2005, and the first quarter 2006 event should take place in March <br /> • Preparation of a work plan to address the concerns raised in the EHD letter of 25 Apri12005 <br /> Objectives of the work will Include further lateral and vertical definition and verification <br />' of the dissolved plume with respect to each of the five informal hydrogeologic units, and <br /> installation of one short-screened well targeting the upper portion of HU5 and located <br /> directly down-gradient of the source location <br />' Preparation of a ground water remediation action work plan for the extraction and treatment <br /> of water from hydrogeologic units HU1, HU2 and HU3 utilizing the current well network <br /> I <br /> 6.0. LIMITATIONS " <br /> I 1 <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br /> io and a limited number of available data points (i e , field parameters and soil vapor samples) and <br /> subsurface conditions may vary away from these data points No other warranty, expressed or <br /> implied,is made as to the professional interpretations,opinions,and recommendations contained in <br />' this report <br /> 1 <br /> J <br /> I 1 I <br /> e 1 <br /> +1 1 <br /> 11 <br /> Advanced GeoEnvironmental,Inc <br /> I <br />