Laserfiche WebLink
' Project Nomellini Construction Project No AGE-NC-95-0121 BORING NO <br />' Site Address 1045 W Charter Way Total Depth 30 feet VW-1 <br /> • Stockton, California Date 14 July 1995 <br />' Drilling Co Soils Exploration Services, Inc Logged by Little Page 1 of 1 <br /> Rig/Auger Type DH-55/8-inch Hollow Stem Reviewed by Ong <br /> RN <br /> CL <br /> NIS <br /> 10— VW-1/10 6 5/8/11 Light brown,damp,CLAY, no hydrocarbon odor <br /> 3 <br /> - VW-1/15 30 3/5/9 Light brown,damp, silty CLAY,no HC odor <br /> 20— VW-1/20 23 3/4/6 Brown,damp,sandy CLAY, no HC odor <br />' - VW-1125 40 4110/14 Brown,moist, CLAY,no HC odor <br /> ' - SM <br /> 30— VW-1/30 65 4110/15 Gray, saturated, silty fine-grained SAND, slight HC odor <br /> Total Depth-30 feet <br /> Ground water encountered at 25 feet. <br /> Boring completed as vapor extraction observation well VW-1 <br /> 40— <br /> Advanced <br /> ' GeoEnvironmental, Inc. <br /> UCW-SUVOME VW 1 SAM 1=91950 4 35 PM <br />