Laserfiche WebLink
-� s �- <br /> Nomellini Construction Company MWA <br /> TPH-g and Ground Water Depth vs Time <br /> j 30,000 35 <br /> 33 <br /> 25,000 -- <br /> 31 <br /> (i <br /> s 29 <br /> 20,000 -- <br /> f <br /> 27 a <br /> r <br /> a <br /> 15,000 25 <br /> 3 <br /> V <br /> >� 23 <br /> k r <br /> 10,000 <br /> CL <br /> 21 <br /> 4 <br /> 19 <br /> k v � <br /> 5,000 <br /> 17 <br /> 0 _ — <br /> 15 TPH-g(ppm) <br /> May-92 Feb-93 Dec-94 Mar-95 Ju[-95 Nov-95 Feb-96 May-96 Aug-96 Nov-96 Feb-97 May-97 <br /> Groundwater <br /> Date Depth(feet) <br />