Laserfiche WebLink
� � � v � � � � � � <br /> Nomellini Construction Company MW-6 <br /> TPH-g and Ground Water Depth vs Time <br /> 11,000 35 <br /> 14,004 <br /> 33 <br /> 9,000 --- y < x <br /> 31 <br /> 8,000 <br /> 29 <br /> 7,000 <br /> 27 <br /> < _ r <br /> 6,000 a <br /> r w <br /> 25 <br /> a <br /> Z o <br /> 5,000 <br /> H t� 23 <br /> 4,000 <br /> 21 <br /> 3,000 L <br /> 19 <br /> 2,000 -- <br /> 1,000 17 <br /> 1S TPH-9{ppm) <br /> 0 <br /> May-92 Dec-94 Mar-95 Jul-95 Nov-95 Feb-96 May-96 Aug-96 Nov-96 Feb-97 May-97 <br /> Groundwater <br /> Date Depth(feet) <br />