Laserfiche WebLink
' • h'q K L E I N F E L D E R <br /> A-2.3 COLLECTION OF GEOPROBE SOIL AND GROUNDWATER SAMPLES <br /> The Geoprobes will be driven 7 to 8 feet below grade to first encountered groundwater. Soil <br /> samples will be obtained by driving a 3/4 inch galvanized pipe with an insert rod by air hammer <br /> to the desired sampling depth. Then, the insert rod will be removed and the open pipe driven an <br /> additional 6 to 12 inches forcing soil into the pipe end. The pipe will be removed from the hole <br /> and the end containing the soil sample will be removed and sealed with Teflon and plastic caps. <br /> Groundwater samples will be collected from the Geoprobe hole using a decontaminated bailer or <br /> a peristaltic pump with new tubing, depending on field conditions. <br /> A-2.4 PREPARATION OF SAMPLES <br /> Each sample will be individually labeled. The label includes Kleinfelder's name,job number, the <br /> date and time the sample was collected, the employee number of the individual who performed <br /> the sampling, and a unique five-digit sample identification number. A custody seal may be <br /> placed on the sample in such a way that any attempt to tamper with the sample is easily visible. <br /> ' A-2.5 SAMPLE HANDLING <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes Kleinfelder's name, address and <br /> ' telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, and the analyses for which the samples are being submitted, if any. The chain- <br /> of-custody form is signed by each person who handles the samples, including all Kleinfelder <br /> employees and the receiving employee of office sample control or the analytical laboratory when <br /> the samples are delivered. <br /> ' A-2.6 DECONTAMINATION OF EQUIPMENT <br /> To reduce the potential for cross-contamination, Geoprobe pipe and associated equipment are <br /> steam cleaned prior to advancing each boring. In addition, sampling equipment is cleaned with a <br /> trisodium-phosphate wash and rinsed with distilled water prior to collecting each soil sample. <br /> ' 23-482276-B00/CR96S070 A-2 June 26 1996 <br /> Copyright 1996 Kleinfelder,Inc. <br />