Laserfiche WebLink
DEL-TECH Geotechsucal Support Service~ <br /> 1 MONITORING WELL FIELD LOG <br /> 1996 <br />' PROJECT NAME AMPLE ANALYSIS PERFORMED SEE CHAIN OF <br /> INDEPENDENT TRUCKING CUSTODY <br /> 1145 CHARTER WAY AMPLE TIME: 14,51 <br /> STOCKTON, CA AMPLE CONTAWER(S). HCL PRESERVED <br /> V O A's, 1 LITRE, 1 PLASTIC <br /> CONTAINERS SUPPLIED BY LABORATORY <br /> ANALYSIS PERFORMED BY SHERWOOD LABS <br /> CLIENT HUNTER &ASSOCIATES DATE. 07/26/1996 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-4 <br /> AMPLER DON LIGHT START TIME- <br /> GROUNDWATER. XXX ADOSE• OTHER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION. FEET MSL CASING DIAMETER' 2 INCH <br /> DEPTH TO WATER. 21 10 FEET ALCULATED CASING VOLUME 2 93 GAL <br /> DEPTH OF WELL: 39 10 FEET OTAL VOLUME PURGED 12 0 GAL <br /> TIME VOLUME pH E.C. TEMP. ORP COLOR OTHER <br /> gallons units Msmhos Degrees C (Mvolts) (Visual) <br /> 1cm <br /> 0 74 211 268 NIA GREY TURBID NO ODOR <br /> 30 73 231 232 TPH SHEEN <br /> 60 73 245 228 " DIESEL ODOR <br /> 90 74 239 219 " <br /> 120 74 233 218 " <br /> PURGE METHOD . SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME 2118' <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, NO LOCK INSTALLED <br /> REMARKS' FAIR RECHARGE <br /> WEATHER CLEAR AND HOT <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION SEE SITE MAP <br /> . <br /> CONTAINMENT' POLY DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORLON CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER 1 D O METER <br /> SOLINIST SLOPE METER 1 KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />