Laserfiche WebLink
DEL-TE <br /> • CH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME FAMPLE <br /> LYSIS PERFORMED SEE CHAIN OF <br /> INDEPENDENT TRUCKING <br /> 1145 CHARTER WAY TIME- 17 45 <br /> STOCKTON,CA TAINERS)' HCL PRESERVED <br /> TRE, 1 PLASTIC FIELD FILTERED <br /> CONTAINERS SUPPLIED BY LABORATORY <br /> NALYSIS PERFORMED BY SHERWOOD LABS <br /> CLIENT HUNTER &ASSOCIATES DATE 09/1611996 <br /> PROJECT MANAGER' BILL HUNTER AMPLE LOCATION MW-9 <br /> SAMPLER DON LIGHT TART TIME. <br /> GROUNDWATER XXX ADOSE• OTHER. WELL HEAD P I D READING 821 PPM <br /> CASING ELEVATION FEET MSL CASING DIAMETER 2 INCH <br /> DEPTH TO WATER 20 20 FEET ALCULATED CASING VOLUME 2 41 GAL <br /> DEPTH OF WELL 35 10 FEET OTAL VOLUME PURGED 10 0 GAL <br /> _:::�l <br /> TIME VOLUME PH E.C. TEMP <br /> allons units Umhos/cm De Tees C Mvolts COLOR OTHER <br /> 0 82 1638 218 NIA LT TURBID GAS ODOR <br /> GRE <br /> 25 77 1574 213 <br /> so 7 5 1602 205 CLEAR u <br /> 75 74 1604 204 " <br /> 100 74 1610 204 u <br /> PURGE METHOD SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1'STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE. DEPTH TO WATER AT SAMPLE TIME 22 42' <br /> WELL INTEGRITY. CAP AND SEAL ARE SECURE, LOCK INSTALLED <br /> REMARKS GOOD RECHARGE 45 GALLONS OF DEVELOPMENT WATER PURGED <br /> PRIOR TO MONITORING <br /> WEATHER SCATTERED CLOUDS AND HOT <br /> QUALITY CONTROL' ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER 8,ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION, SEE SITE MAP <br /> • CONTAINMENT. POLY DRUMS <br /> INSTRUMENTATION ORION PH/TEMPERATURE METER 2 POINT PH CALIBRATION (4 0 8, 7 0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER/D O METER <br /> SOLINIST SLOPE METER/KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />