Laserfiche WebLink
4e014gwal7ecknecs Inc Page 6 <br /> Yd Quarter 2002 Groundwater Momtonng Report <br /> Project No 507 2 <br /> January 17,2003 <br /> ' Recommendations <br /> • Maintain the modified quarterly monitoring schedule <br /> ' • Monitor the site wells for indicators of remediation by natural attenuation <br /> • Use the geologic cross sections showing I so concentration contours of petroleum <br /> ' contaminants in the soil and groundwater as the basis for performing contaminant mass <br /> estimate calculations <br /> • A work plan for "In Situ Remediation Feasibility Study" dated September 20, 2002 and <br /> ' an addendum to this plan was submitted on December 20, 2002 Once the County <br /> approves the plan, we will submit a cost pre-approval package to the Fund <br /> ' 4.0 LINIITATIONS <br /> ' This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices It <br /> ' should be recognized that the process of defining and evaluating environmental conditions <br /> is a difficult and an inexact science Judgments leading to conclusions and <br /> recommendations are generally made with an incomplete knowledge of the site-specific <br /> Mconditions present <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> ' local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />