Laserfiche WebLink
Geologccal rech&a W Page b <br /> I"Quarter 2002 Groundwater Monitonng Report <br /> Project No 507 2 <br /> June 17, 2002 <br />' 7 The site exhibits a predominantly downward component of vertical groundwater flow <br /> 8 The contaminant concentrations in well MW-9 continue to fluctuate but the plume <br />' remains stable <br />' Recommendations <br /> • Maintain the modified quarterly monitoring schedule <br /> • Monitor the site wells for indicators of remediation by natural attenuation <br />' • Prepare a work plan for a pilot study of in situ treatment alternatives <br /> ' 4.0 LMTATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices It <br /> should be recognized that the process of defining and evaluating environmental conditions <br />' is a difficult and an inexact science Judgments leading to conclusions and <br /> recommendations are generally made with an incomplete knowledge of the site-specific <br /> conditions present <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the Iaw No warranty, expressed or implied, is <br /> made <br />