May 26, 1999 <br /> Job Number SN-1 10 <br /> Page 2 I <br /> FIELD-DENSITY TEST RESULTS <br /> The following tests were performed on the fuel tank backfill.at east side of site. <br /> Date Test Dry Moisture RelativeLocation Elevation <br /> # Density Content Compaction - <br /> pcf % %- <br /> 5-17-99 1 122.8 5.9 90 NW End -12' <br /> 5-17-99 2 123.0 1 5.9 90 N End -12' <br /> 5-17-99 3 124.1 6.4 91 < S End -12' <br /> I <br /> IT-14' aggregate base fill, 90% relative compaction required. All tests passing. <br /> The following tests were performed on the old fuel:lank-trench:backfill at east side of site. <br /> 5-17-99 1 123.1 9.1 90 NW End -10.5' <br /> 5-17.99 2 122.9 9.3 90 N End -10.5' <br /> 5-17-99 3 124.3 9.0 91 S End -10.5' <br /> IT-14' aggregate base fill, 90% minimum relative compaction required. All tests passing. <br /> The following tests were performed on the.old el tank backfill at east side ofsite. <br /> 5-18-99 1 133.3 6.1 98 NW End -9' <br /> 5-18-99 2 131.3 5.9 96 N End -9' <br /> 5-18-99 3 131.5 6.5 96, S End -9' <br /> 5-18-99 4 134.4 5.9 98 NW End <br /> 5-18-99 5 125.9 5.9 .92 N End -7.5' <br /> 5-18-99 6 130.0 7.2 95 S End -7.5' <br /> 13'-14' aggregate base fill, 90% minimum relative ompaction required. All tests passing. <br /> The following rests were performed on the old reel tank backfill at cost side ofsite.. <br /> 5-19-99 7 130.0 6.2 95 NW End <br /> 5-19-99 8 130.9 5.6 96 N End -1.5' <br /> 5-19-99 9 126.6 7.2 93 S End <br /> IT-14' aggregate base fill, 90%minimum relative compaction required. All tests passing. <br /> t OEr.ss°'{ <br /> N <br /> Q ~ <br /> P <br /> 4SS0r <br /> it <br /> s �I <br /> h <br />