Laserfiche WebLink
UL Underwriters laboratories Inc.o <br />NOTICE OF AUTHORIZATION TO APPLY THE UL MARK <br />Northbrook Office <br />333 Pfingsten Road <br />Northbrook, Illinois 60062-209 <br />United States Country Code (1; <br />(847) 272-8800 <br />FAX No. (847) 272-8129 <br />hnp:uNrvw.ul.com <br />November 29, 1999 <br />Ameron Inc. <br />Attn: Mr. Joie Folkers <br />1004 Ameron Road <br />PO Box 878 <br />Burkburnett TX 76354 <br />Our Reference: File MH15596, Project 98NK43160 <br />Subject: 2 inch and 3 inch Diameter Fiberglass Clamshell Secondary Containment <br />Fittings for Dualoy 3000LCX Piping (90° Elbows, 45° Elbows, Tees, Couplings <br />and Closures). 3 inch Diameter Plastic Secondary Containment Fittings for <br />Dualuy 300OLCX Piping (Closures and 3" x 2" Reducers). 3 inch Diameter <br />Plastic over Fiberglass Secondary Containment Fittings for Dualoy 3000LCX <br />Piping (90° Elbows, 45° Elbows and Tees) <br />Dear Mr. Folkers: <br />We have completed our engineering investigation under the above project number and find the <br />products comply with the applicable requirements. <br />This letter temporarily supplements the UL Follow -Up Services Inspection Procedure and serves as <br />authorization to apply the UL Listing Mark, only at the factory under UL's Follow -Up Service <br />Program, to the above products, which are constructed as described below: <br />Identical to the subject model which was submitted to UL for this investigation. The UL records <br />covering the product will be in the Follow -Up Services Inspection Procedure, File MH15596, Volume <br />3. <br />To provide the manufacturer with the intended authorization to use the UL Mark, the addressee <br />must send a copy of this Notice and all attached material to each manufacturing location as <br />currently authorized in the appropriate UL File Procedure. <br />This authorization is effective for 90 days only from the date of this Notice and only for <br />products at the indicated manufacturing locations. Records covering the product are now being <br />prepared and will be sent to the indicated manufacturing locations in the near future. Please <br />note that Follow -Up Services Procedures are sent to the manufacturers only unless the Applicant <br />specifically requests this document. <br />Products produced, which bear the UL Mark, shall be identical to those evaluated by UL and found <br />to comply with UL's requirements. If changes in construction are discovered, authorization to <br />use the UL Mark may be withdrawn and products that bear the UL Mark may have to be revised (in <br />the field or at the manufacturer's facility) to bring them into compliance with UL's <br />requirements. <br />Respectfully, <br />/ <br />clr <br />DOUGLAS SCHWARTZ (Ext.\42947) <br />Project Engineer <br />Engineering Services - 3016B <br />E-mail: Douglas.G.Schwartz@us.ul.com <br />Reviewed by: <br />WAYNE DOVERSBERGER (Ext. 42072) <br />Engineering Group Leader <br />Engineering Services - 30168 <br />E-mail: Wayne.B.Doversberger@us.ul.com <br />A not-for-profit organization <br />dedicated to public safety and <br />committed to quality service <br />