Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br />Donna K. Heran, R.E.H.S. <br />N: < Director <br />r" Al Olsen, R.E.H.S. <br />Program Manager <br />F o a Laurie A. Cotulla, R.E.H.S. <br />Program Manager <br />August 22, 2005 <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Website: www.sjgov.org/ehd/ <br />WAYNE PERRY INC <br />30 MAIN ST, STE #5 <br />SACRAMENTO CA 95838 <br />Re: BP ARCO, 130 S. Wilson Way, Stockton, CA <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Jeff Carruesco, R.E.H.S. <br />The permit application to expose the product lines for the exploration of a leak has been <br />approved with the following conditions: <br />1. A complete description of work performed must be submitted prior to scheduling <br />the final inspection. <br />2. If any piping is to be repaired or replaced Environmental Health Department <br />(EHD) must be notified so that an inspection can be arranged and parts can be <br />approved prior to commencing work. Per Environmental Health assessment of <br />findings, new plans and an addendum to the permit application may be required <br />to be submitted. <br />3. Soil sampling may be necessary per Environmental Health assessment. <br />4. An ICC installer certified individual may be required to be onsite. <br />5. A line integrity test on the primary piping of all exposed lines must be performed <br />by a certified technician and results received by this office prior to the final <br />inspection. <br />6. If concrete is broken near the underground storage tank a tank integrity test must <br />be performed by a certified tank tester prior to the final inspection. <br />7. A 24-hour lake test will be required on any sumps that require repair/replacement. <br />8. EHD must witness a 30 -minute pressure test on all repaired/replaced piping prior <br />to backfill. <br />9. Arrange a final inspection with this office prior to returning this station into full <br />service. Give 48 hour notice for all inspection appointments. <br />If you have any questions, please call Willy Ng, Sr. REHS at (209) 468-3448. <br />Thank you, <br />Willy Ng,. REHS <br />Senior Registered Environmental Health Specialist <br />