My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2004 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 11:39:42 AM
Creation date
3/7/2019 9:33:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2006
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BP West Coast Products, LLC <br />Station #: <br />Address: <br />Electronic Leak Detector Test Data Sheet <br />5469 Date: 41'21/2005 <br />130 S WILSON WAY <br />STOCKTON <br />Test Information <br />Comments: <br />This letter certifies that the annual leak detector tests were performed at the above <br />referenced facility according to the equipment manufacturers procedures and <br />limitations and the results as listed are to my knowledge true and correct. The <br />mechanical leak detector test pass/fail is determined using a low flow threshold trip <br />rate of 3 gph at 10 PSI. <br />Inspected By: Contractor: Tait Environmental Systems <br />Technician '6.Pc2� Lic?# <br />Signature: <br />1 <br />2 3 4 5 <br />Product <br />d, 0 <br />Manufacturer <br />S <br />' <br />Model <br />G <br />�� <br />Line Bleed Back (ml) <br />.r----- <br />--- —�- <br />Check Valve Holding Pressure (psi) <br />--- <br />_ <br />Test Leak Rate (ml/min) (gph) <br />PASS or FAIL <br />I c, -.S', <br />r–�SS X55 <br />Comments: <br />This letter certifies that the annual leak detector tests were performed at the above <br />referenced facility according to the equipment manufacturers procedures and <br />limitations and the results as listed are to my knowledge true and correct. The <br />mechanical leak detector test pass/fail is determined using a low flow threshold trip <br />rate of 3 gph at 10 PSI. <br />Inspected By: Contractor: Tait Environmental Systems <br />Technician '6.Pc2� Lic?# <br />Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.