Laserfiche WebLink
SWRCB, Januuy2002 <br />t S-14 ('9 page--.--,, <br />Ll- - i -v� <br />4. SPILLlOVERFILL CONTAINMENT BOXES <br />FeciLat <br />is Not Equipped WithSnilllOverfll? Containment Sflze:r it I <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />1 eetZti� ethodDevelopedBy: <br />0 Spill Bucket Manufacturer <br />0 Other (Speci�, ) <br />34ndustry Standard <br />0 Professional Engineer <br />T e st 1A etho,l U s e d: <br />(- <br />0Pre ssure <br />0 Othe <br />0 Vacuum <br />drostatac <br />j Test Equipment' Used: <br />Equipment Resolution: <br />Spill Box# <br />SPMBortlV <br />Spill Box# Of Spill Box# <br />Bucket Diameter: <br />Bucket Depth <br />Wait time between applying <br />pre ssurelvacuum/water and <br />startingtest: <br />JV, � <br />- <br />Ii7� `l <br />kill I 11 <br />Test Start Time <br />0C, G�� <br />: CG0 <br />v <br />Al eading (RO <br />Test End Time: <br />7 <br />2`CC <br />2'. <br />2!00 <br />oco <br />Final Re ading (RF): <br />- f . c : <br />s - ✓ <br />'� <br />_ ` <br />q - f <br />Test Duration: <br />Change in Reading (Riv Ri: <br />i <br />Pass/Fail Threshold or <br />Criteria: <br />1 `^ <br />�{L J C2S�j <br />v4 15 <br />Test Result <br />Pass - <br />,a, Pass <br />14M <br />Pass <br />)Rifl O Pass O Fall <br />Comments — !include mk,),manon on repairs macre prior to felting and recommended fotiow-up for failed tests) <br />