Laserfiche WebLink
' SWRCB,January 2002 Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present.but were Not Tested: El <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard ❑ Professional Engineer <br /> Other(Spec) <br /> Test Method Used: ❑ Pressure Vacuum ❑X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1-87 Spill Box# 2-89 Spill Box# 3-91 Spill Box# <br /> Bucket Diameter: 11 1/2 11 1/2 11 1/2 <br /> Bucket Depth: 13 13 13 <br /> Wait time between applying <br /> pressure/vacuum/waterand 5MIN. 5MIN. 5MIN. <br /> starting test: <br /> Test Start Time: 9:00 9:00 9:0 0 <br /> Initial Reading(RI ): 9" 9" 9" <br /> Test End Time: 10:10 10:10 10:10 <br /> Final Reading(RF ): 911 9° 9 <br /> Test Duration: 60MIN. 60MIN. 60MIN. <br /> Change in Reading(R F-R! ) 0" 0" 0" <br /> Pass/Fail Threshold or PASS PASS PASS <br /> Criteria: <br /> Test Result: x Pass Fail % Pass Fail a Pass Fail Pass Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW SPILL BUCKETS ON SITE. <br />