Laserfiche WebLink
41FIED PROGRAM CONSOLIDATED FC _,I <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 1 <br /> (Two pages per tank) <br /> Page_of <br /> TYPE OF ACTION 1.NEW PERMIT ❑ 4.AMENDED PERMIT ❑ 5.CHANGE OF INFORMATION ❑ 6.TEMPORARY TANK CLOSURE 430. <br /> (Check one item only) ❑ 3.RENEWAL PERMIT ❑ 7.PERMANENTLY CLOSED ON SITE <br /> (Specify reason) (Specify reason) ❑ 8.TANK REMOVED <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3. FACILITY ID: 1. <br /> AiRc-© FAq_kL-V 'Y o!S*(o9 <br /> LOCATION WITHIN SITE(optional) 431. <br /> I.TANK DESCRIPTION <br /> (A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID# 432. TANK MANUFACTURER 433, COMPARTMENTALIZED TANK ❑Yes No 434. <br /> UNk:fl If"Yes,"complete one page for each compartment. <br /> DATE INSTALLED 435. TANK CAPACITY IN GALLONS 436. NUMBER OF COMPARTMENTS 437. <br /> (YEAR/MO) V g t J l� 1000 O0 / <br /> ADDITIONAL DESCRIPTION(For local use only) 438. <br /> II.TANK CONTENTS <br /> TANK USE 439. PETROLEUM TYPE 440. <br /> 'Y, 1. MOTOR VEHICLE FUEL la. REGULAR UNLEADED ❑2. LEADED ❑5. JET FUEL <br /> (If checked,complete Petroleum Type) 19 lb. PREMIUM UNLEADED [13. DIESEL ❑6. AVIATION GAS <br /> ❑ 2. NON-FUEL PETROLEUM ❑lc. MIDGRADE UNLEADED ❑4. GASOHOL ❑99.OTHER: <br /> ❑ 3. CHEMICAL PRODUCT COMMON NAME (from Hazardous Materials Inventory page) 441. CAS#(from Hazardous Materials Inventory page) 442. <br /> ❑ 4. HAZARDOUS WASTE <br /> (Includes Used Oil) <br /> ❑ 95.UNKNOWN <br /> III.TANK CONSTRUCTION <br /> TYPE OF TANK ❑1. SINGLE WALL ❑3. SINGLE WALL WITH EXTERIOR [15. SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443 <br /> (Check one item only) MEMBRANE LINER ❑95. UNKNOWN <br /> 2. DOUBLE WALL ❑4. SINGLE WALL IN A VAULT ❑99. OTHER <br /> TANK MATERIAL-primary tank ❑L BARE STEEL 3. FIBERGLASS/PLASTIC ❑5. CONCRETE ❑95.UNKNOWN 444. <br /> (Check one item only) ❑2. STAINLESS STEEL ❑4. STEEL CLAD W/FIBERGLASS ❑8. FRP COMPATIBLE ❑99.OTHER: <br /> REINFORCED PLASTIC FRP W/100%METHANOL <br /> TANK MATERIAL-secondary tank ❑1. BARE STEEL X3. FIBERGLASS/PLASTIC ❑8. FRP COMPTIBLE W/100%METHANOL ❑95.UNKNOWN 445. <br /> (Check one item only) [12. STAINLESS STEEL ❑4. STEEL CLAD W/FIBERGLASS ❑9. FRP NON-CORRODABLE JACKET ❑99.OTHER <br /> REINFORCED PLASTIC(FRP) ❑10. COATED STEEL <br /> ❑5. CONCRETE <br /> TANK INTERIOR LINING ❑1.RUBBER LINED ❑3.EPDXY LINING ❑5.GLASS LINING ❑95.UNKNOWN 446. DATE INSTALLED 447. <br /> OR COATING ❑2.ALKYD LINING ❑4.PHENOLIC LINING ❑6.UNLINED [199.OTHER <br /> Check one item only) <br /> OTHER CORROSION [11.MANUFACTURED CATHODIC [13.FIBERGLASS REINFORCED PLASTIC [195.UNKNOWN 448, DATE INSTALLED 449. <br /> PROTECTION PROTECTION ❑4.IMPRESSED CURRENT ❑99.OTHER <br /> If Applicable) [12.SACRIFICIAL ANODE <br /> SPILL AND OVERFILL YEAR INSTALLED 450. TYPE 451. OVERFILL PROTECTION EQUIPMENT: YEAR INSTALLED 452. <br /> (Check all that apply) ❑1.SPILL CONTAINMENT ❑1.ALARM ❑3.FILL TUBE SHUT OFF VALVE <br /> ❑2.DROP TUBE ❑2.BALL FLOAT ❑4.EXEMPT <br /> ❑3.STRIKER PLATE <br /> IV.TANK LEAK DETECTION <br /> (A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK 453. IF DOUBLE WALL TANK OR TANK WITH BLADDER 454. <br /> (Check all that apply) (Check one item only) <br /> ❑1. VISUAL(EXPOSED PORTION ONLY) ❑5.MANUAL TANK GAUGING(MTG) ❑1.VISUAL(SINGLE WALL IN VAULT ONLY) <br /> ❑2. AUTOMATIC TANK GAUGING(ATG) ❑6.VADOSE ZONE 2.CONTINUOUS INTERSTITIAL MONITORING <br /> ❑3. CONTINUOUS ATG [17.GROUNDWATER ❑3.MANUAL MONITORING <br /> ❑4. STATISTICAL INVENTORY RECONCILIATION ❑8.TANK TESTING <br /> (SIR)+BIENNIAL TANK TESTING ❑99. OTHER <br /> V.TANK CLOSURE INFORMATION/ PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455' ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456 TANK FILLED WITH INERT MATERIAL? 457. <br /> gallons ❑Yes ❑ No <br /> UPCF hwfwrc-b(1/99)-1/4 http://www.unidocs.org Rev.02/16/00 <br />