Laserfiche WebLink
Nov 26 2007 2:05PM <br />a <br />CRRBONTECH <br />41 <br />Veeder-Root <br />In -Station Diagnostics (ISD) <br />MonRoritg is the key to successful vapor <br />recovery compliance. <br />Veeder-Rooth California Air Resources Board <br />(CARB) certified In -Station Diagnostic (ISD) <br />equipment is designed to monitor the collection <br />and containment of vapors by vapor recovery <br />equipment. Using the existing Veeder-Root TLS- <br />350/EMC platform, probes and Dispenser <br />Interface Module (DIM) cards, the ISD software <br />continuously monitors the vapor recovery equip- <br />ment, maintains test records, provides test <br />reports, and generates warnings / alarms follow- <br />ing equipment failures. <br />The ISD system includes the following ne�v com- <br />ponents: <br />Vapor Flow Meter (Sensor) — One per <br />dispenser, designed to measure the volume of <br />vapors collected during vehicle refueling for <br />vapor collection monitoring <br />Vapor Pressure Sensor — One per station, <br />designed to continuously measure contain- <br />ment tank pressures for leakage and over- <br />pressure conditions for vapor containment <br />monitoring <br />ISD Software Enhancement Module (SEM) <br />One per TLS, activates ISD software <br />technology <br />The ISD system monitors gasoline vapors from the delivery <br />tanker to the tank of a car to ensure that the vapor recovcry <br />equipment is operating properly and the air remains dear. <br />�� VEEDER-ROOT <br />9098643032 <br />ISD can be added to any TLS -350 <br />allowing you to leverage your <br />investment and centralize rnorti- <br />toring and recording activities. <br />• NVMEM 2 Board — (Non -Volatile Memory) One <br />per TLS, provides memory expansion necessary for ISD <br />report storage <br />As of the September 1st, 2005 implementation date, ISD <br />systems are required for new and rebuild stations in CA <br />that dispense more then L.8 million gallons / year. The <br />implementation date for new and rebuild stations dispens- <br />ing more then 600 million gallons /year is April 2006. For <br />both throughputs, existing stations must retrofit an ISD <br />system within four years from the implementation date. <br />For details as well a$ to view the CARB Executive Order <br />requiring Enhanced Vapor Recovery (EVR) and In -Station <br />Diagnostics (ISD) see the CARB website at <br />http://www, arb. ca. gov/vapor/eos/co-vr202/eo-vr2O2a.htm. <br />p.46 <br />tits of the- Vaedtt-Rbaf Y <br />tr_ RB CeKcf, ied to meet Enna Iced' �r2t�ittir 2li, � �;� <br />t • reduternents ::. <br />"tft:4e�ul>xn theta <br />'Co <br />prottlettt Ar> hose <br />x l Yshcn theca tats a^e is lealurig <br />e~aft t?eatiderl to t a7sr n TLS 3>(i console te�rl <br />�k :sensors are 4b Le to Shure _wren r <br />g condwt v+AH other Veedt:sr <br />k lnterra s co the:existtng S Hart Sensor Ir, er.`ace Madule (gj.l* <br />;.inpuLC'erSICR)� - ,':f ° ... <br />t <br />;t Strnple ins allatinn, cprripattble with a)l dispensers, tis <br />.Lndetwiiters Laburacaries (UL) listed <br />3 onttiYue aS monit0ritzg of the Vapor =Wv&y system inctuding notification lf!the sysienYs <br />x pertotmance drops belo,u reclwteri 164-, <br />+ !lrchlte toe repviU requtd Io�ia as3 <br />• Reductrcn tm e i,o , r latecf a fared 191 <br />tttc1i g- gizip hent <br />r Ire er3ges exisCp?g 35,d a+fptnii}nx <br />