My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 12:18:21 PM
Creation date
3/7/2019 10:51:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007 PARTIAL TANK TOP UPGRADE & EVR
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB..lanuan 2002 <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Page 2 . <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By:Spill Bucket Manufacturer Industry Standard O Professional Engineer <br />Ifl Other (Specify) TECH <br />Test Method Used: Pressure VacuumI I\ drostatic <br />Other (Specifi,) <br />Test Equipment Used: <br />I yuihmCnt RC)OIL ion: <br />FS <br />alrom <br />Spill Box # 1 REG FILL <br />Bucket Diameter: 10X11 <br />spill ii- » --. i t I. ;. = T:::: <br />10X11 <br />Spill Boc # 3 SUP FILL <br />10X11 <br />Spill Box # <br />Bucket Depth: 12 <br />12 <br />12 <br />Wait time between applying <br />pressure/vacuum/water and SMIN <br />starting test: <br />5MIN <br />5MIN <br />lest Start Time: 1200 <br />1200 <br />1200 <br />Initial Reading (RI ): 11 <br />11 <br />11 <br />Test End Time: 1300 <br />1300 <br />1300 <br />Final Reading (RF ): 11 <br />11 <br />11 <br />Test Duration: 1HR <br />1HR <br />1HR <br />Change in Reading (R F - Rt ) 0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: El Pass El Fail <br />El Pass 0 Fail <br />IT] Pass El Fail <br />ElPass El Fail <br />Com inents -(include information on repairs made prior to testing, and reconuznended follow-eip for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.