Laserfiche WebLink
Dec 0'6 2007 5 : 27PM CARBONTECH 9098643032 p . 7 <br /> A% Fiberglass-Composite .Wipe Division <br /> AMERON <br /> 1NrEENArIorfAL DUALOY® 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> Rolando Nunez <br /> TLM Petro Labor Force <br /> has completed training on the proper installation procedures for <br /> the DuaIoy 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3000 <br /> JL ® f LCX <br /> California <br /> Location of Training <br /> May 31, 2006 <br /> Date of Training <br /> Bill Robbins <br /> Issued By <br /> Certificate valid for three years from date of issue <br /> 9724 Cypresswood Drive, Houston, TX 77070 <br /> FP6686 <br />