Laserfiche WebLink
8. <br />a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />RFS) )1U4L P✓n Jvcr i5 7-4C Jwwk WILL Ar nR r4 <br />b. T=L -/Piping Hauler: <br />Name F -e -r <br />AddressZ 5-5- f IN2 K l31 `' P city1Zetym O zip 3 L/ X D I <br />Phone No.( SI C) <br />Hauler Registration # (if hauled as hazardous) -&A0 Do 9!/% (0 3'7 2 <br />c. To*/Piping Disposal Site: <br />Name �L = <br />Address 2 SS pejAx I3lyo cid, %L, cLjm 6k4/> Zip % Y k0I <br />Phone No. I d ) 23 S- 15 9 3 <br />EPA ID# (if transported to a permitted TSD facility)_I-Ab 00'/ /6, Io3C7Z <br />9. Is the sampling firm an independent third party from the contractor? YES.A NO [ J <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />Mr4V AvGvVIL ov- vv%c.,✓t%IA-11v CourGT- Sv►c SeNA-Ac=h *r CoHsvCra,�.r <br />ro���t'n�z R�cowi►NI�tin t.aca+:o.n�. SoiL wiu. F'r Cou,ictE1---5 <br />r3izA» 5 L64012 9C 4P4)C- A 4A -h Tc- FIom 6#9Engti4� �1�4snL QYI) t4r-S SgL S�PIF> <br />?(Acv) �� a ceo�EiZ w / Mr etv TQ ' <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />(L'A'v 6'-L 1.,, I <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />&I"/(- . j>lA'Si/L <br />b) What will be the final destination of the excavated stockpile? <br />Shcc. Sc�v►n��;�n� or st-oL ;Al WLL 0ftcvrt;or- ► 4AI 7C��'r>giiw► ot= Sale <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name_ <br />Address_ 25-5' 3l v i') <br />Phone No. <br />EH 23 046 (Revised 8/9/06) 5 <br />Hauler Registration # C4D L011Y643?2 <br />city �lc l-{y_►�y�n zip 4q fSo / - <br />